Polski

Bridge (Elbląg)

Unit description

Drawbridge in Elblag (historically: Low) was built in the streets of Orla-Studzienna in 2013. The bridge has a length of 56 m and a width of 9 m. It is three-span, two-lane. Designed primarily for pedestrians and vehicles. Additionally equipped with closed barriers and voice signaling. Bridge automatically controlled.

Hours in which you can see opening / closing: 07.00 am, 09.00 am, 11.00 am, 01.00 pm, 03.00 pm, 05.00pm, 07.00 pm, 09.00 pm outside the freezing period.

Year Built 2013
Length 56 m
Width 9 m
Weight bd

Scope of work

In 2011, during the construction of the bridge in Elbląg, AN-ELEC was responsible for the following works:

  • design and implementation of bridge automation control (PLC + HMI) with control algorithm
  • CCTV video system
  • sound system on the bridge
  • delivery, installation and commissioning of the backup power supply system

Other projects:

Marco Polo (NB56)

Marco Polo (NB56)

Mobile Pearl

Mobile Pearl

vidar

Vidar

Photos

View the embedded image gallery online at:
http://an-elec.com/realizations/bridge-elblag#sigFreeIdd6d997ba0c