Polski

VIDAR

Unit description

VIDAR (NB 130) is a specialized hydraulic craft built in 2013 at Crist Shipyard. The main purpose of the unit is to build offshore wind farms for a German wind energy company - Hochtief Solutions AG.

The "Heavy Lift Jack up Vessel" is characterized by a total length of 140.29 m and a width of 41.24 m and gross tonnage of 18886. VIDAR can quickly change to 1.2 thousand tone crane. The unit has legged "legs" in the sea bottom length of 90 m which allows to work at a depth of up to 50 m

In addition to VIDAR, the ship was also called VOLE and now VOLE AU VENT

Year Built 2013
Length 140,29 m
Width 41,24 m
IMO 9655315

Scope of work

At a specialist hydraulic engineering unit built in CRIST Shipyard in 2013, AN-ELEC carried out the following works:

  • performing all electrical locksmith works
  • Laying / pulling cables
  • formwork, connection and commissioning
  • commissioning

Other projects:

Marco Polo (NB56)

Marco Polo (NB56)

ZOURITE (NB 105)

ZOURITE (NB 105)

Bridge (Elbląg)

Bridge (Elbląg)