Polski
KOPALNIA RYDULTOWY

KOPALNIA RYDULTOWY

Renovation of the electrical installation on a transport ship in 2010 ...

m/v Kraków

Kraków

Reconstruction of the unit from the bulk carrier to the conveyor belt, service and off-site work in 2007/2008...

KVANNOY (B 692)

KVANNOY (B 692)

Works at Nauta Shipyard on rebuilding unit m/v Kvannøy...

LANDEGODE (SKS 120)

LANDEGODE (SKS 120)

Ship built on the Remontowa Shipbuilding SA in 2012 on which we performed ...

LOTOS PETROBALTIC

LOTOS PETROBALTIC

Reviewing and upgrading lifts on the platform are just some of the items made...

Marco Polo (NB56)

Marco Polo (NB56)

Electrical switchboards, control panels, cable trays and cable laying are just some of made items...

M/V RICKMERS MARINE

MARINE RICKMERS

Service work consist of regulation of generators on vessel type...

Marty Quist Tide (B844/18)

Marty Quist Tide (B844/18)

Comprehensive implementation of all electrical equipment on the AHTS type...

mobile crane GROVE

mobile crane GROVE

Repair of GROVE RT1650 mobile crane in 2007 made on...

SMT Mobile Pearl (Bontrup Pearl)

Mobile Pearl (Bontrup Pearl)

Design, delivery of materials, assembly and commissioning of the unloading system on the unit…

Museum Scheepvaart

Museum Scheepvaart

Renovation of the electrical installation at the National Maritime Museum in Amsterdam...

NB70

NB70

The passenger and car ferry was built at the Crist Shipyard, where our company performed...

nordanvik

Nordanvik

Review, revision of the main switchboard or repair on a transport unit...

Ocean Platinum

Ocean Platinum

Transporter was established in 2012, where we working on tasks...

oceanograf

OCEANOGRAF

Comprehensive electrical installation and sentence for Shipowner and the Classification Society...

odra

ODRA

Renovation of the electrical installation in 2010 on the unit...

Oleg Strashnov

Oleg Strashnov

Electrical installation, electrical switchgear, control panels, alarms and monitoring systems...

ORP BIELIK

ORP BIELIK

Construction and modification of the battery cooling system on the Kobben unit...

ORP GNIEZNO

ORP GNIEZNO

Transitions and cable trains, laying / pulling cables on a Lublin type unit...

Koben ORP „KONDOR”

ORP KONDOR

Installation and commissioning of an additional battery cooler system...

ORP SOKÓŁ

ORP SOKÓŁ

Works on a kobben unit in 2007 on which they were made...

ORP Wodnik

ORP Wodnik

Installation, connection and start-up on a Wodnik unit in 2005...

P310 ELEKTRA

P310 ELEKTRA

Installation of electrical installations, cable trays. Connection, start and more...

petrojarl-1

PETROJARL I

Verification, documentation preparation, connections are only some items made...

Port Gdynia

Port Gdynia

Installation, connection and delivery to the shipowner in the area...

Regalia

Regalia

Electroinstallation works, documentation it's just some of the work done on the platform...

SCARABEO 6

SCARABEO 6

Drilling rig renovated. Electrical installation work, documentation development...

SEA JACK

SEA JACK

Comprehensive services made on the platform while working on the superstructure of the year...

Sea Vaillant (B844/20)

Sea Vaillant (B844/20)

AHTS type unit built in 2010 on which our company was working in the field...

SEA VICTOR (B844/21)

SEA VICTOR (B844/21)

Another AHTS unit in the portfolio of our company. We have been working on the ship...

Seafox 4

Seafox 4

Cable trays, lighting systems, switchgears and control panels are just the few thing...

Subsea7 Seven Atlantic

Seven Atlantic

Documentation, electrical installation work on a dive ship built in 2010...

Subsea7 Seven Oceans

Seven Oceans

Pipelay vessel for laying pipes, AN-ELEC comapny in 2007...

Subsea7 Seven Rio

Seven Rio

Cable laying, assembly and connection of switchboards, transformers, monitoring, control panels...

Subsea7 Seven Seas

Seven Seas

Another Pipe Layer in our portfolio which allows to work under water to depth...

SIEM AIMERY

SIEM AIMERY (B101/1)

Electrical installation on unit built in the Polish shipyard Remontowa Shipbuilding...

SIEM PRIDE

SIEM PRIDE (PSV 856-2-3)

PSV ship built in the Polish Remontowa Shipbuilding on which our company...

SIMARA ACE

SIMARA ACE

Passenger ship built in 2007 by the Polish shipyard Remontowa Shipbuilding...

SKAGERAK

SKAGERAK

Comprehensive electrical installation on a ship built for the Gothenburg University...

m/f SKANIA

SKANIA

Passenger boat built in 1995 on which AN-ELEC performed the following...

minerval / SMT BONTRUP

SMT BONTRUP

Comprehensive electrical installation, electrical switchgear, design...

mv Somerset

Somerset

Gantry, belt conveyor, service works, electrical switchgear on Cargo unit...

Sopot (VIGHNHARTA)

Sopot

Conveyor belt, converter, service works are just some of the work done...

Star Care

Star Care

Transitions, cable trains or cable laying on the ship's unit...

Star Endavour I

Star Endavour I

Construction and execution of cable trays, cable laying or connection on the unit made…

STENA LINE

STENA LINE

Design, construction and commissioning of electrical switchgear on passenger ferry...

TAKLIFT 4

TAKLIFT 4

Performing electrical installation work on the TAKLIFT 4 ship in the Netherlands...

Tenerife Spirit

Tenerife Spirit

Renovation of the electrical installation on a tanker built in 2000...

Tommy Sheridan Tide (B844/12)

Tommy Sheridan Tide (B844/12)

Locksmith work (prefabrication and assembly) on an ATHS unit for the shipowner...

Trinto

Trinto

Construction of main and auxiliary switchgears, cable extension (muffing)...

Page 2 of 3