Bridge (Przegalina)

Unit description

The newly built bridge in Przegalina (on the canal linking the Wisla River with its old riverbed - Martwa Wisla River) is a weighing nearly 50 tonnes span of the drawbridge of 21 meters in length. The facility was built in 2012. The investor is the Gdansk Road and Green Administration

Year Built 2012
Length 21 m
Width bd
Weight ~50 t

Scope of work

AN-ELEC in 2011 was responsible for the construction of the drawbridge in Przegalin:

  • complete installation
  • construction, assembly and commissioning of switchgears
  • construction, assembly and commissioning of the control panel
  • execution and implementation of the bridge automation and hydraulics control algorithm based on the ABB AC500 controller (distributed system)