Polski

Bridge (Przegalina)

Unit description

The newly built bridge in Przegalina (on the canal linking the Wisla River with its old riverbed - Martwa Wisla River) is a weighing nearly 50 tonnes span of the drawbridge of 21 meters in length. The facility was built in 2012. The investor is the Gdansk Road and Green Administration

Year Built 2012
Length 21 m
Width bd
Weight ~50 t

Scope of work

During the construction and subsequent periods of the drawbridge, AN-ELEC was responsible for the following works:

Year 2024

  • replacement of the HMI panel of the bridge control system.
    Due to the need to replace the HMI panel with a different model, it was necessary to modify the software and configure it to adapt to the existing system.

Year 2021

  • complete installation
  • construction, assembly and commissioning of switchgears
  • construction, assembly and commissioning of the control panel
  • execution and implementation of the bridge automation and hydraulics control algorithm based on the ABB AC500 controller (distributed system)