The newly built bridge in Przegalina (on the canal linking the Wisla River with its old riverbed - Martwa Wisla River) is a weighing nearly 50 tonnes span of the drawbridge of 21 meters in length. The facility was built in 2012. The investor is the Gdansk Road and Green Administration
Year Built | 2012 |
Length | 21 m |
Width | bd |
Weight | ~50 t |
Scope of work
During the construction and subsequent periods of the drawbridge, AN-ELEC was responsible for the following works:
Year 2024
- replacement of the HMI panel of the bridge control system.
Due to the need to replace the HMI panel with a different model, it was necessary to modify the software and configure it to adapt to the existing system.
Year 2021
- complete installation
- construction, assembly and commissioning of switchgears
- construction, assembly and commissioning of the control panel
- execution and implementation of the bridge automation and hydraulics control algorithm based on the ABB AC500 controller (distributed system)