ENVIK

Unit description

This unit was built in 1983, which is destined to transport cement. The ship's manager is SMT Shipmanagement. ENVIK is 95.8 m long and 16.50 m wide with a gross tonnage of 3686.

Year Built 1983
Length 95,8 m
Width 16,50 m
IMO 8208464

Scope of work

On the ENVIK unit in 2012, 2013 the company AN-ELEC was entrusted with the following works

  • installation of a new Perkins aggregator
  • design, construction and assembly of "main" switchgear powered by new aggregate
  • design, construction and assembly of pneumatic unloading control switchgear (500kW compressor, 350kW cement pump, unloading process supervised by PLC ABB AC500)
  • execution of all connections and cable routes
  • modernization of rudder power supply - execution of new electrical installation and power supply cabinet
  • tests of connected systems