NB913
Unit description
Hybrid ferry equipped with two diesel engine and two sets of batteries, which are the main source of power. After completion all work, unit will work in Norway.
Start of construction | 2019 |
Length | 66 m |
Width | - |
IMO | - |
Scope of works
AN-ELEC in 2019 on the construction of NB913 at the Crist Shipyard in Gdynia for the Norwegian shipowner carried out the following works:
- installation of all main and local cable routes
- mounting fittings for electrical equipment
- laying 47,000 m of electrical installation and partial connection of Main Switchboards