STENA LINE
Unit description
Stena Line is a well known Polish ferry operator operating in Scandinavia, Ireland, Germany and the United Kingdom. In our country we serve Gdynia - Karlskrona connections for over 20 years. On this route, MF Stena Spirit, MF Stena Vision and MF Stena Baltica are sailing.
MF Stena Spirit is the unit where AN-ELEC reassembled the work entrusted to him. The unit is a large passenger-car ferry. Formerly MS Stena Scandinavica (2003), after extensive reconstruction, was renamed Stena Spirit.
We also carried out our work on the following units:
- Stena Spirit
- Stena Ebba
- Stena Estelle
- Stena Vision
- Stena Flavia
- Stena Scandica
- Stena Baltica
- Stena Livia
- Stena Ebba
- Stena Skane
- Stena Meclenburg
Scope of work
AN-ELEC performed the following works for the Swedish shipowner Stena Line:
Rok 2025
- Stena Spirit
- construction, installation and commissioning of new switchboards
-
construction and modernization of the freight elevator control
The control system consists of a main 10-inch screen in the control room and an additional touch panel at the delivery point. Operation involves selecting the target level, and pallets are automatically delivered to the appropriate locations (e.g., kitchen, duty-free shop, hotel section). Transport is via rollers and an elevator, with delivery signaled by lights and sounds. - Stena Ebba
- laying of control cables 7x1.5mm2 700m and two parallel cables 350m each
- installation of Roxtec cable penetrations
- closing cable penetrations
- Stena Scandica
- assembly, connection of LED lamps for the unit
- Stena Estelle
- installation of communication cables
Year 2024
- Stena Ebba - installation of a new power box
- Stena Spirit - installation, connection of additional power supply to vending machines
- Stena Estelle - modernization of the existing installation by replacing electrical installation boxes with metal ones
- Stena Estelle - installation of a new power box
- Stena Vision - installation, connection of LED lamps for the unit
- Stena Vision - installation of new power cables
Year 2023
- Stena Spirit - installation, connection of LED lamps for the unit
- Stena Skane - installation, connection of LED lamps for the unit
- Stena Flavia - installation, connection of LED lamps for the unit
- Stena Meclenburg - installation, connection of LED lamps for the unit
- Stena Scandica - installation, connection of LED lamps for the unit
- Stena Baltica - installation, connection of LED lamps for the unit
- Stena Livia - installation, connection of LED lamps for the unit
Year 2020
- installation, connection of over 100 lamps for Stena Vision and Stena Spirit units
- expansion of the fire protection system in the unit's gym
- replacement of old cabling with new one (3500 m)
Year 2017
- cable entries
-
power switchgear (RO53, RO95)
- preparation of documentation and certification of it
- construction and assembly of the switchboard (modernization consisting in the replacement of the entire equipment of the power cabinets for container sockets on car decks)
- fire protection design documentation
Year 2016
- design, construction and commissioning of the Car Deck ventilation switchgear
- exchange of rudder blade indexes
- replacement of rudder power contactors with cabinet modification