
EDT PROTEA
Pulling, laying and connecting cables on ship MPSV type for shipowner...
Pulling, laying and connecting cables on ship MPSV type for shipowner...
Service works or construction of the crane and conveyor belt on the ship mv Gdynia...
Installation, connection and start-up on a Wodnik unit in 2005...
Conveyor belt, crane or service works on the unit...
Construction and modification of the battery cooling system on the Kobben unit...
Power supply and control switchgear, service work on a transport type unit from 1979...