Polski

Y720

Project description

Project carried out in the Netherlands as a continuation of fitting the super yacht vessel with the system of main and individual cable ways and penetrations. The whole was implemented in an aluminum structure; the cable ways were connected by welding; the ways were executed on the basis of isometric documentation provided by the client.

Scope of work

In project "Y720" our company was responsible for

  • execution and installation of cable ways (aluminum)
  • making of cable penetrations

Other projects:

Blackford Dolphin

Blackford Dolphin

ZOURITE

ZOURITE

Bridge (Elbląg)

Bridge (Elbląg)